A high voltage electrical outage has been scheduled for Circuit LA3 for Tuesday, August 10, 2021. The outage is scheduled for 30 minutes starting at 6:00 AM and ending by 6:30 AM. This outage was originally scheduled for Tuesday, August 3, 2021 but has been rescheduled to Tuesday, August 10, 2021 in order to provide more notice. The purpose of this outage is to transfer loads from the Laurel Avenue substation to the Main Substation. This will negate the need to increase the contract demand with KUB for the Laurel substation which will result in some cost savings. After this outage the buildings that are currently on Circuit LA3 will be on Circuit 10. If you experience problems during, or after, this outage please call Facilities One Call at (865) 946-7777. If there are questions please contact Cesar Penalba, (865) 974-7769, mailto:[log in to unmask] Electrical power will be affected in the following buildings: Alumni Memorial Building Austin Peay Building Burchfiel Geography Building Dougherty Engineering Building Ferris Hall Hesler Biology Building and Greenhouse Hesler Biology Chilled Water Plant (serves Hesler, Alumni, Burchfiel, Austin Peay, Ayres, South College) John D. Tickle Engineering Building Nielsen Physics Building North end of Neyland Stadium Nuclear Engineering Perkins Hall Walters Life Sciences Building Zeenah Engineering Services Facility Cooling only will be affected in the following buildings: Ayres Hall South College -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=- To join/leave the list or browse past event notifications, please see http://listserv.utk.edu/archives/oitevents.html For information and support, please contact: OIT HelpDesk (865) 974-9900