One building switching electrical power outages (PO) (See definition of Switching Power Outage) has been scheduled for the . Student Union Phase I and Phase II.
The switching outage will be as follows:
The Power Outage will start Tuesday May 21st at 6:00 AM and continue for 5 min ending on Tuesday May 21st 19th at 6:05 AM
The reason for the outage is to disconnect/connect HV circuits at our main substation.
Definition: A Building Switching Power Outage (PO) is described as any schedule event lasting less than 1 hour.
This power outage consists of operating a building's dedicated 13.2KV circuit breaker or main secondary circuit breaker and turning power off to the complete building.
Questions concerning this outage may be directed to Roy Warwick at 974- 7768 [log in to unmask] or Cesar Peņalba at 974-7769 [log in to unmask]
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-