Two (2) Partial building electrical power outages (PO) (See definition of Partial Building Power Outage) have been scheduled for KPB.
The outages will be as follows:
Power Outage -First
The Partial Power Outage will start Saturday, February 3rd at 8:00 am and continue for 5 minutes ending on Saturday, February 3rd at 8:05 am
Power Outage -Second
The Partial Power Outage will start Saturday, February 3rd at 8:00 pm and continue for 5 minutes ending on Saturday, February 3rd at 8:05 pm
The reason for the partial outage is for OIT to perform UPS service. The emergency generator at KPB will be on line with data center load between 8:00am and 8:00pm.
Definition: A Partial Building Power Outage (PO) is described as switching off sub-panel(s) inside the building that affect a small area or limited number of rooms.
Questions concerning this outage may be directed to Roy Warwick at 974- 7768 [log in to unmask] or Cesar Peņalba at 974-7769 [log in to unmask]
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-