|
|
This Power Outage scheduled for 1/23/16 has been postponed. (see building list below)
Power Outage - 2 of 2
The Power Outage will start Saturday 1/23/16 at 11:00 pm and continue for 4 hours ending on Sunday 1/24/18 at 3:00 am
The reason for the outage is to connect new Underground distribution feeding the Ag Campus/Allan Jones and, disconnect the Stand-by circuit.
Definition: A Power Outage (PO) is described as any schedule event greater than 2 hours.
This power outage consists of operating a 13.2KV distribution circuit breaker turning power off to the complete UT circuit (Ckt 7 and Ckt 8).
Questions concerning this outage may be directed to Roy Warwick at 974- 7768 [log in to unmask] or Cesar Peņalba at 974-7769 [log in to unmask]
Building List
Animal Science Lab
BESS Storage Building
BESS Tank and Equipment Storage
Biosystems Engineering Labs Building
Biosystems Engineering Office Building
Brehm Animal Science
Business Incubatory
Butler Building
Central Greenhouse
Ceramics Annex
CRC-Bioenergy Science
CRC-Material Science
Crops Genetic Lab
Ellington Plant Science Building
Environment and Landscape Lab
Food Safety and Processing
Food Science and Technology Building
Forest Genetics Greenhouse (17)
Greenhouse #10
Greenhouse #13
Greenhouse #14 (Plastic)
Greenhouse #15 (Hydroponic)
Greenhouse #16 (Plastic)
Greenhouse TVA
McCord Hall
Morgan Hall
North Greenhouse
Plant Biotechnology Building
Plant Propagation Building
Plant Sciences Annex B
Publications and Services Building
Racheff Research
Shade House
South Greenhouse
Storage Building
UT Gardens Support
Veterinary Teaching Hospital
W. Allan Jones Intercollegiate Aquatic Center
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
To join/leave the list or browse past event notifications, please see
http://listserv.utk.edu/archives/oitevents.html
For information and support, please contact:
OIT HelpDesk (865) 974-9900
|
|
|
|
|
|