Two [2] electrical power outages(See definition of power outage) have been scheduled for the following buildings (see list below).
The first outage will begin on Friday, August 2nd , 2013 at 11:00 pm and will end on Saturday August 3rd , 2013 at 1:00 am.
The second outage will begin on Saturday, August 3rd , 2013 at 8:00 pm and will end on Saturday August 3rd , 2013 at 10:00 pm.
The purpose of these power outages is to install underground duct back at the corner of Lake Loudon Blvd and Phillip Fulmer Way.
Definition: Power Outage (PO) - 4-6 hours
The power outage consists of operating a 13.2KV switch at the SUBSTATION.
This operation turns power off to the complete circuit (all buildings attached
to the circuit).
Questions concerning this outage may be directed to Cesar Penalba at 974-2505 or [log in to unmask]
Buildings List
Administration Parking Garage
Andy Holt Tower
Berry Hall
College of Nursing
Communications
East Skybox & Press box
Estabrook Hall
Hearing and Speech Center
Heavy Equipment Shop @ Steam Plant
Jane and David Bailey Education Complex
John D. Tickle Engineering Bldg.
Neyland Drive Biology Annex
Pasqua Nuclear Engineering Building
Pratt Pavilion
South & East Stadium
Stadium Drive Parking Garage G-10
Steam Plant
Steam Plant Coal Conveyor Shed
Steam Plant Gear Switching/Turbine Building
Student Services Building
Thompson-Boling Assembly Center
West Skybox Addition
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
To join/leave the list or browse past event notifications, please see
http://listserv.utk.edu/archives/oitevents.html
For information and support, please contact:
OIT HelpDesk (865) 974-9900
|