An electrical power outage (PO) (See definition of power outage) has been scheduled for the following buildings (see list below). The outage will begin on Sunday,
December 9th, 2012 at 10:00 AM and will end on Sunday, December 9th at 4:00 pm. The purpose of this outage is to transfer UT buildings located at the Hill and Min H. Kao Electrical Engineering & Computer Science to the new Laurel substation circuit LA2.
Definition: Power Outage (PO) - 4-6 hours
The power outage consists of operating a 13.2KV switch at the SUBSTATION.
This operation turns power off to the complete circuit (all buildings attached to the circuit).
Questions concerning this outage may be directed to Roy Warwick at 974-2415 [log in to unmask] or Cesar Penalba at tel. 974-2505 [log in to unmask]
Buildings List
Ayres Hall
Dabney-Buehler Hall
Science and Engineering Building - CHILLER
Science and Engineering Building
South College
Min H. Kao Electrical Engineering & Computer Science
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-