An electrical power outage (PO) (See definition of power outage below) has been scheduled for the buildings listed below.
The outage will begin on Saturday, March 24, 2012 at 1:00 am and will end on Saturday March 24, 2012 at 7:00 am.
The purpose of this outage is to install new 15KV cable in underground distribution for the New Laurel Substation project.
Definition: Power Outage (PO) -- 6 hours
The power outage consists of operating a 13.2KV switch at the SUBSTATION.
This operation turns power off to the complete circuit (all buildings attached
to the circuit).
Questions concerning this outage may be directed to Roy Warwick at 974-2415 or [log in to unmask]
Buildings List
Ayres Hall
Dabney-Buehler Hall
Dougherty Engineering Building
Ferris Hall
Perkins Hall
Science and Engineering Building
Science and Engineering Building (Chiller)
South College
Min Kao (ECE)
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-