On Wed, 9 Mar 2011, Zeller, Darrin M wrote:
> I am currently trying to get details from Facilities about this outage.
> This test should only affect the generator protected power panels for
> the KPB data center and not the entire building, but I want to get
> verification from them. Please stay tuned...
I have received a reply from Facilities: "normal power will still be
available at the Bldg. The only equipment that will experience a power
loss is the equipment tied to the emergency switchboard."
Power to offices and desktops should not be impacted, however, some HVAC
equipment in the building may be affected along with emergency lights
which may switch on/off during the test.
-----
Darrin Zeller
IT Operations Manager, Office of Information Technology
Systems: IT Operations
The University of Tennessee
100 Stokely Management Center
916 Volunteer Blvd.
Knoxville, TN 37996
Phone: 865-974-1586
/--------------------------------------\
| One Contact 865-974-9900 |
| Many Solutions http://help.utk.edu |
\--------------------------------------/
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
To join/leave the list or browse past event notifications, please see
http://listserv.utk.edu/archives/oitevents.html
For information and support, please contact:
OIT HelpDesk (865) 974-9900
|